Qualcomm Powers Up Data Center Expansion with Efficient Design

Qualcomm collaborated with A.O. Reed & Co. to enhance the efficiency of their 1.7 MW data center for expansion and reliable operation.

A.O. Reed managed the mechanical and plumbing upgrades in this design-assist project.

Customer Needs

The project included unique design characteristics to meet Qualcomm’s needs:

  • Additional data space
  • Cooling backup contingencies
Key Strategies Implemented

The project included the design of two new single-story CMU buildings. To adequately back up in case of mechanical failure, the team added a thermal storage tank to support the 500-ton air cooled backup chiller in the main central plant.

In addition, the team installed:

  • 48 in-row cooling units capable of operating with inlet water of 61 degrees
  • 12,000-gallon tanks
  • Rooftop package cooling units
  • Rooftop dehumidification units
  • Floor drains
  • Industrial water
Engineering & Design
Impact
Location
San Diego, CA
project size
4,783 SF
Year Completed
2020
Awards
Energy Savings
Quote

Latest News

Recent news.

Press Release
8.15.25
Legence Files Registration Statement for Proposed Initial Public Offering
Press Release
7.30.25
Legence Recognized in U.S. News & World Report’s 2025-2026 Best Companies to Work For : Private Companies
Article
5.20.25
We're About To Lose One of the Best Things the Government Ever Built
Insights

Explore our latest thinking.

Information on energy efficiency, building decarbonization, energy policy and the people behind the energy transition.
Learn More