Therma, a Legence company, partnered with Healthpeak Properties to design and build flexible HVAC and plumbing systems for Phases 1 and 2 of The Cove at Oyster Point—a transformative mixed-use campus on South San Francisco’s waterfront.
The Cove at Oyster Point was designed to attract life sciences companies with complex and varied research needs. Therma worked closely with the owner and design team to engineer flexible HVAC and plumbing systems that could adapt to tenant-specific lab and office requirements—supporting early leasing and long-term versatility.
With its focus on flexibility, connectivity, and innovation, The Cove at Oyster Point has become a model for future-ready life science campuses. Phase 1 laid the groundwork with advanced facilities that included an amenities space, while Phase 2 expanded the vision, enhancing the campus with more versatile spaces and a reimagined waterfront experience. The result is a dynamic, resilient environment that redefines work-life balance in the heart of South San Francisco.
Entire campus has achieved LEED Gold certification, reflecting its commitment to sustainable design and construction.